| Infrastructure |
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
 |
| Our Commitment |
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
| |
|
| Infrastructure |
 |
 |
 |
Good environment & safety are not possible without sufficient resources & hence Leela has a pool of resources on yard including
- Asbestos handling room complying to international requirements
- 4 high capacity winches for load sharing during pulling down pieces of ships
- 3 crawler cranes for material transfer and loading on plot
- 7 chains for anchoring multiple ships
- 7 chain pulley blocks used for safe anchoring process
- High capacity wire ropes used with winches
- Cranes for safe material transfer
- D Shackles used for lifting and transfer of items on plot
- 25 fire extinguishers on plot
- 2 high capacity fire fighting pumps with water tank capacity of 50,000 litres
- Highly audible emergency siren for emergency situation notification
- Oxygen level gas indicator for confined space safety
- Explosive level gas indicator safe working in fuel tanks
- Water gel blankets to cover minor burns areas
- First aid boxes on plot, safety room and on ship
- Sanitation facility for workers
- Change rooms & Rest rooms facility for workers
- Staff quarters with good amenities
- Diesel generator for emergency power requirements
- Laboratory for analyzing known or unknown items derived from ship to prevent any incidents from incorrect usage
- Bilge water tanks for bilge water collection
- LED based helmets to work in engine room areas
|
|
|