| Hazardous Management |
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
 |
| Our Commitment |
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
|
 |
 |
 |
| |
|
| Hazardous Waste Management |
 |
 |
 |
- Asbestos containing material (ACM) received from ship is dismantled in Asbestos abatement centre.
- ACM material is then sprayed with special fluid to ensure that material is soft in nature and does not become friable during abrasive handling.
- ACM material is then collected in bags which is kept in asbestos storage area and sent to TSDF site very next day.
- Asbestos containing material is then heat sealed in airtight bags & disposed it to TSDF land fill site as soon as possible.
|
|
|