Hazardous Waste Management
  • Asbestos containing material (ACM) received from ship is dismantled in Asbestos abatement centre.
  • ACM material is then  sprayed with special fluid to ensure that material is soft in nature and does not become friable during abrasive handling.
  • ACM material is then collected in bags which is kept in asbestos storage area and sent to TSDF site very next day.
  • Asbestos containing material is then heat sealed in airtight bags & disposed it to TSDF land fill site as soon as possible.
Copyright © 2010 Leela Ship Recycling Pvt Ltd